Minutes of the
52nd MTE meeting held on Friday February 3rd 2012
Present :
Y. Bernard, C. Bertone, J. Borburgh, R. Brown, S. Damjanovic, S. Gilardoni, M. Giovannnozzi,
M. Hourican, J.-M. Lacroix, M. Lazzaroni, S. Mataguez, S. Roesler
Excused :
M. Poehler
Main items
Conclusions and actions from
the meeting
Blade
material: Cu or W. The choice will be made on considerations other than
RP.
Blade dimensions: length is already optimised. Thickness should be
considered together with details of the particles' trajectories. The
study of loss location of particles that have been scattered on the
septum blade should be made (Action: ABP). The height
of the blade should maybe reviewed in view of matching it to the total
vertical beam size (about 14 mm) (Action: ABP and RP).
Shielding material: concrete is perfectly adapted. It has been
decided to try a configuration with marble (on the floor) and concrete
in the higher part of the shielding). The impact of removing the
metallic table replacing it with concrete or marble blocks should be
assessed (Action: RP).
Access to the dummy septum should be foreseen on the inside of the
tunnel (lower radiation levels). The vertical walls should be
asymmetric: thinner on the magnet unit 14 side, thicker on the magnet
unit 15 side with a check with numerical simulations (Action: RP).
The height of the shielding should be larger than the PS main magnet
height, agreeing with SU on the solution to enable the sight required
for alignment (Action: ABP to contact SU).
Septum design: the blade should be installed as much upstream as
possible. The support will be reviewed assuming that a concrete or
marble block will be used to install the alignment system to enable a
quick installation while keeping an alignment of about 1 mm. The maximum
clearance should be provided for beam aperture. As soon as a realistic
design is available it should be studied in terms of beam impedance (Action:
ABP). The energy deposited should be estimated to provide input
for the design of the static cooling (Action: RP to provide data
to ABT). The need for vacuum pump should be clarified (Action:
ABT to contact VCR).
Installation and design of shielding: a tour of the PS tunnel should
be organised to quantify the dimensions of the area in the SS15 region (Action:
MEF and HE). A rough cost estimate should be provided as soon
as possible (Action: HE - transport and concrete - MEF -
drawings).