Date & n.
|
Agenda meeting: |
#87 2014 March
20 |
-
BTV Installation status (S. Burger)
-
PS PE.TPS15 displacement system (P. Van Trappen)
|
#86 2014 January
9 |
-
Dummy septum impedance measurements (S. Persichelli)
|
#85 2013
November 28 |
-
Projet BTV Dummy 15 (N. Jurado)
|
#84 2013
November 21 |
-
Dummy septum
impedance measurements
(S. Persichelli)
|
#83 2013
October 10 |
-
TPS Progress
(M. Hourican)
|
#82 2013
September 19 |
-
TPS Progress
(M. Hourican)
|
#81 2013
August 29 |
-
Review of progress with activities
|
#80 2013
August 7 |
-
Draft report on dummy
septum 15
|
#79 2013
July 4 |
-
Individual and Collective Dose Estimates for Interventions at
the PS SS15
(S. Damjanovic)
|
#78 2013
June 13 |
-
Dummy 15 BTV Screen considerations
(S. Burger)
|
#77 2013
May 30 |
-
Local Shielding around
the Dummy Septum 15
(S. Damjanovic)
|
#76 2013
May 23 |
-
Shielding in septum 15 blocks configuration
(R. Fernandez Ortega)
-
Status and
developments of the shielding studies for the dummy septum TPS15
(M. Hourican)
|
#75 2013
May 16 |
-
Shielding in septum 15 blocks configuration
(R. Fernandez Ortega)
-
Status and development of the BTV for the dummy septum TPS15
(S. Burger)
|
#74 2013
May 2 |
-
Dummy septum impedance studies
(S. Persichelli)
-
Status and
developments of the shielding studies for the dummy septum TPS15
(M. Hourican)
|
#73 2013
April 11 |
-
Shielding in septum 15 blocks configuration
(R. Fernandez Ortega)
-
Shielding around the Dummy Septum15: Original vs. Final design
(S. Damjanovic)
|
#72 2013
April 4 |
-
Review of PS dummy septum shielding
(R. Fernandez Ortega)
-
Comments on the proposed shielding (J.-M. Lacroix)
|
#71 2013
February 28 |
-
Review of PS dummy septum shielding
(R. Fernandez Ortega)
|
#70 2013
February 8 |
-
Shielding blocks requirements
(M. Hourican)
|
#69 2013
January 17 |
-
Status and
developments of the shielding studies for the dummy septum TPS15
(M. Hourican)
-
Comments on dummy 15 BTV instrument (S. Burger)
|
#68 2012
December 13 |
-
Status and
developments of the shielding studies for the dummy septum TPS15
(M. Hourican)
|
#67 2012
November 22 |
-
Individual and Collective Dose Estimates for Interventions at
the PS SS15 (S. Damjanovic)
-
MTV DUMMY 15 Development Status (S. Burger on behalf of D.
Gerard)
-
Status and
developments of the shielding studies for the dummy septum TPS15
(M. Hourican)
|
#66 2012
November 1 |
-
Intervention
Scenarios TPS15 (M. Hourican)
-
Dose Estimate for the Extra Vacuum Pump in SS15 under
Irradiation (S. Damjanovic)
|
#65 2012
October 19 |
-
Dummy septum impedance studies (S.
Persichelli)
|
#64 2012
October 11 |
-
Status and developments of the dummy septum TPS15 for the CERN
PS Multi-Turn Extraction - beam observation discussions (M. Hourican)
-
Dummy 15: extra pump study (C. Pasquino)
-
Shadowing of SMH16 Realistic beam tracking with FLUKA/PTC (S. Damjanovic, C. Hernalsteens)
|
#63 2012
September 27 |
-
Status and developments of the dummy septum TPS15 for the CERN
PS Multi-Turn Extraction(M. Hourican)
-
Where to put an extra pumping port (C. Pasquino)
|
#62 2012
September 13 |
-
Vacuum Analysis of PS Sector 20 (C. Pasquino)
-
Dummy septum: update on the shadowing studies (C. Hernalsteens)
|
#61 2012
August 30 |
-
Dummy septum: beam dynamics and shadowing studies (C. Hernalsteens)
|
#60 2012
August 2 |
-
Shadowing of SMH16 by the dummy septum (C. Hernalsteens)
|
#59 2012 July
5 |
-
Status and developments of the dummy septum TPS15 for the CERN
PS Multi-Turn Extraction (H. Hourican)
|
#58 2012 June 7 |
-
Shadowing of SMH16 by the dummy septum
(C. Hernalsteens)
-
Angular stability at extraction in the PS
(A. Lachaize)
-
Status and developments of the dummy septum TPS15 for the CERN
PS Multi-Turn Extraction (H. Hourican)
|
#57 2012 May 10 |
-
Dose and Radiation Damage in the PS Magnet Coils
(S. Damjanovic)
|
#56 2012 April 26 |
-
PS wall layout and preliminary integration of dummy septum (J.-M. Lacroix)
-
Sensitivity of the BLM position in SS15 to the dummy blade angle
(S. Damjanovic)
-
Shielding Effects of Supplementary Walls Region of LINAC3
(S. Damjanovic)
|
#55 2012 March 29 |
-
Proposal of a dummy
septum to mitigate ring irradiation for the CERN PS Multi-Turn
Extraction: part III (M. Hourican)
-
Aperture and geometry for the dummy septum in SS15
(C. Hernalsteens)
|
#54 2012 March 15 |
-
Energy Deposition in
Dummy Septum Blade Beam Screen Window Dummy
Septum Tank Vacuum Chamber of MMU15 (S. Damjanovic)
-
Optimization
of the local shielding around the dummy septum 15 (S. Damjanovic)
|
#53 2012 March 1 |
-
Proposal of a dummy
septum to mitigate ring irradiation for the CERN PS Multi-Turn
Extraction: part II (M. Hourican)
-
Energy deposition in dummy septum blade, dummy septum tank,
vacuum chamber MMU15 (S. Damjanovic)
|
#52 2012 February 3 |
-
Dummy septum
in SS15 of PS ring in LS1 (M. giovannozzi)
-
Dummy
Septum in SS15 (S. Damjanovic)
-
Proposal of a dummy
septum to mitigate ring irradiation for the CERN PS Multi-Turn
Extraction (M. Hourican)
|
#51 2011 October 20 |
-
Analysis of recent PS
measurements
|
#50 2011 September 1 |
-
Analysis of recent PS
measurements
|
#49 2011 August 25 |
-
Analysis of recent PS
measurements
|
#48 2011 July 28 |
-
Analysis of recent PS
measurements
-
Displacement of γ-jump quadrupole in SS15
|
#47 2011 July 7 |
-
Analysis of recent PS
measurements
|
#46 2011 May 19 |
-
Analysis of recent PS
measurements
|
#45 2011 May 12 |
-
Analysis of recent PS
measurements
|
#44 2011 May 5 |
-
Analysis of recent PS
measurements
|
#43 2011 Apr 14 |
-
Trajectory fluctuations
in SPS: latest results
|
#42 2011 Mar 10 |
-
Global analysis of
MTE and CT beams in PS and SPS
|
#41 2011 Feb 16 |
-
MTE action plan -
what is foreseen in 2011?
|
#40 2009
Mar 3 |
-
Summary of the meeting on the RF
for MTE (March 3rd 2009)
|
#39 2009 Jan
27 |
-
Summary of the meeting on MTE
controls (January 27th 2009)
|
#38 2009 Jan 15 |
- Status of production of spare MU16 vacuum chamber (M. Giovannozzi)
- Summary of beam commissioning results (M.
Giovannozzi)
- Proposal for EDMS node for MTE (M.
Giovannozzi)
- Kicker activities during 2008/9 shut down in light of beam
commissioning results (L. Sermeus)
|
#37 2008 Sep 25 |
- Round table on
+ MTE beam commissioning status (S. Gilardoni)
+ Status of production of spare MU16 vacuum chamber (M.
Caccioppoli)
+ Overall planning of PS 2008/9 shutdown (R. Brown)
+ Status of drawings for MTE-related modifications (J.-M.
Lacroix)
+ Status of hardware for installation of new flying wire (C.
Ball)
+ Kickers’ activities for MTE during 2008/9 shutdown (L. Sermeus)
|
#36 2008 July 16 |
- Round table on
+ status of kickers (T. Fowler)
+ status of MTE commissioning (M. Giovannozzi)
|
#35 2008 July 3 |
- Round table on
+ status of kickers (T. Fowler)
+ status of MTE commissioning (M. Giovannozzi)
|
#34 2008 June 19 |
- Round table on
+ status of kickers (T. Fowler)
+ status of MTE commissioning (M. Giovannozzi)
|
#33 2008 June 5 |
- Round table on
+ status of kickers (T. Fowler)
+ status of MTE commissioning (S. Gilardoni)
|
#32 2008 May 27 |
- Round table on
+ status of kickers (L. Sermeus / T. Fowler)
+ status of controls (C. Dehavay)
+ situation of MTE magnets (M. Giovannozzi)
- MTE commissioning planning (M. Giovannozzi) [PDF]
|
#31 2008 May 8 |
- Round table on
+ status of controls (C. Dehavay)
+ situation of MTE magnets (M. Giovannozzi)
|
#30 2008 Apr
24 |
- Round table on
+ status of kickers' PFNs (L. Sermeus)
+ status of controls (C. Dehavay)
+ situation of spare gamma-jump quadrupole (M. Giovannozzi)
|
#29 2008 Apr 10 |
- Round table on
+ general status of PS (R. Brown)
+ octupole magnets (D. Bodart)
+ discharge power converters (J.-M. Cravero)
+ kickers (L. Sermeus)
+ status of PFNs (L. Sermeus)
+ status of controls (C. Dehavay)
+ situation of spare gamma-jump quadrupole (M.
Karppinen / M. Giovannozzi)
|
#28 2008 Mar 13 |
- Round table
+ Status of shut-down activities (R. Brown)
+ Status of kickers (T. Fowler/M. Giovannozzi)
+ Status of controls (C. Dehavay)
+ Status of new magnets (D. Bodart/M. Giovannozzi)
|
#27 2008 Feb 28 |
- Round table
+ Status of kickers (L. Sermeus)
+ Status of programmable power converters (A. Beuret)
+ Status of shut-down activities (R. Brown)
+ Status of new magnets (M. Giovannozzi)
|
#26 2008 Feb 19 |
- Round table
+ Status of kickers (T. Fowler)
+ Status of discharge power converters
(J-M Cravero)
+ Status of new magnets (D. Bodart & M. Giovannozzi)
+ Status of controls for MTE (C. Dehavay)
+ Status of shut-down activities (M. Giovannozzi)
|
#25 2008 Jan 31 |
- Round table
+ Status of the new vacuum chambers (M. Caccioppoli
& R. Principe)
+ Status of shut-down activities (R. Brown)
+ Status of octupoles (D. Bodart)
+ Status of kickers (T. Fowler)
+ Displacement of a PS corrector magnet (M. Giovannozzi)
|
#24 2008 Jan 16 |
1. Round table
+ Status of controls for MTE (C. Dehavay)
+ Status of the new vacuum chambers (M. Caccioppoli/G. Favre)
+ Status of kickers (T. Fowler)
+ Status of shut-down activities & bump 16 cables (R. Brown)
+ Status of octupoles (D. Bodart)
+ Status of spare gamma-jump quadrupole (D. Bodart)
+ Status of (discharge & programmable) power converters
(J-M Cravero & A. Beuret) |
#23 2007 Dec 19 |
- Round table:
+ Situation of special vacuum chambers (M. Caccioppoli/G.
Favre) + Status of kickers (T. Fowler) + Status of
shut-down activities & bump
16 cables (R. Brown) + situation of octupoles (D. Bodart)
|
#22 2007 Dec 04 |
- Round table:
+ Situation of special vacuum chambers (M. Caccioppoli/G.
Favre) + Status of kickers (T. Fowler) + Status of the bump
16 cables (R. Brown) + situation of octupoles (D. Bodart) [JPG]
|
#21 2007 Nov 22 |
- Situation of special vacuum chambers (M. Caccioppoli)
- Back-up solution for bump 16 power converters in case of
late delivery of cables (J.-M. Cravero) [DOC]
- Round table:
+ situation of octupoles (D. Bodart/T. Zickler) [JPG]
+ situation of kickers (T. Fowler)
+ overall situation of shutdown activities (R.
Principe) [PPT,
MPP]
+ naming of PS elements and controls (A. Franchi) [PDF]
|
#20 2007 Nov 5 |
- Status of kickers (L. Sermeus) [PPTX]
- Status of special vacuum chambers (M. Giovannozzi)
- Status of controls (C. Dehavay) [PDF1,PDF2]
- Status of cables (R. Brown/M. Giovannozzi)
|
#19 2007 Oct 26 |
- Status of power converters (A. Beuret & J.-M. Cravero)
- Status of cables (R. Brown)
- Status of magnets (D. Bodart) [PDF]
- Status of special vacuum chambers (M. Caccioppoli)
- Workshop activities (SS vacuum chambers and supports) (G. Villiger)
[PPT]
- Changes to the PS shut down schedule (R. Brown/R. Principe)
|
#18 2007 Oct 4 |
- Comments on vacuum acceptance tests at Zanon (E. Mahner)
- Update on vacuum chambers MU14/15/16 (M. Giovannozzi)
- Final layout of cables (R. Brown/M. Giovannozzi)
- Status of octupoles (T. Zickler)
- Functional specification for kickers and safety issue (T.
Fowler)
- Status report on the production of the new spare gamma-jump
quadrupole (M. Karppinen) [PPT]
|
#17 2007 Sep 13 |
- Change of schedule for installation of third horizontal wire
scanner (R. Principe/M. Giovannozzi) [PDF]
- Update on vacuum chambers from Zanon (M. Giovannozzi)
- OCT and XCT RMS currents for cabling (A. Franchi)
[PDF]
- Definition of signals for the MTE (R. Steerenberg) [PDF]
|
#16 2007 Aug 30 |
- Situation of the cards for
passive circuit compensation in MU14, 15, 16 (M. Giovannozzi)
- Status of vacuum chambers and
bellows for new vacuum chambers for MU14,15,16 (M. Caccioppoli)
- MTE Planning (J. Monteiro) [PDF]
- Status of Sextupole and
octupole cabling (R. Brown)
|
#15 2007 Aug 02 |
- Status of vacuum chambers at
Zanon, bellows and flanges (M. Caccioppoli)
|
#14 2007 Jul 05 |
- Presentation of the new accelerator schedule (M.
Giovannozzi) [PDF]
- Discussion of signals for the MTE (R. Steerenberg)
[XLS]
- Round table
- status of Octupoles (T.Zickler/D. Bodart) [PDF]
- Situation of vacuum chambers at Zanon (M. Giovannozzi)
|
#13 2007 Jun 07 |
- Report on the search for
vacuum chamber during the technical stop (G. Villiger) [PDF]
- New constraints in SS15
|
#12 2007 May 24 |
- Status of MU14, 15, 16, vacuum
chambers at Zanon (M. Caccioppoli)
- Status of integration of kickers in SS04, 13, 21 (G.
Villiger) Slides [PTT]
- Vacuum acceptance tests
schedule (E. Mahner)
|
#11 2007 May 10 |
- MD studies in 2007 (S.
Gilardoni)
- Integration of kickers (G.
Villiger) Slides [PTT] table
[XLS]
- Round table
+ Availability of vacuum chambers and flanges from vacuum stocks
(E. Mahner)
+ Status of the controls for the MTE (F. Di Maio)
|
#10 2007 April 26 |
- New scheme for the correction
of trajectories in TT2 (A. Franchi) [PTT]
- Round table
+ Status of the new special vacuum chambers (M. Giovannozzi)
+ Status of the new octupoles (T. Zickler)
+ Activities for next shutdown (G. Villiger)
|
#9 2007 Mar 29 |
- Round table
+ Status of the new vacuum chambers (M. Giovannozzi)
+ Status of the new octupoles (T. Zickler)
+ Status of PS hardware commissioning (R. Brown)
+ Report on the 80 MHz RF cavity test (C. Rossi) Slides [PDF]
+ Status of the kickers installation in TT2 (L. Sermeus)
|
#8 2007 Mar 01 |
- Budget status for kickers (T. Fowler)
Table [PDF]
- Planning of the MTE activities
in 2007/8 (J. Monteiro) Table1 [PDF]
Table2 [PDF]
- Round table
+ Status of new octupoles (T. Zickler)
+ Status report of PS ring installation (R. Brown)
|
#7 2007 Feb 01 |
- Status of new vacuum chambers
for MU14, 15, 16 (R. Principe)
- Round table
+ Status report of PS ring installation (R. Brown)
+ Status of RF cavity move (C. Rossi)
+ Status report of TT2 installation (J. Monteiro)
|
#6 2007 Jan 18 |
- Status of design of vacuum
chambers for MU14, 15, 16 (G. Villiger) Slides [pdf]
- Round table
+ Status of new octupoles (T. Zickler)
+ Status report of PS ring installation (R. Brown)
+ Status report of TT2 installation (J. Monteiro)
+ Status of kickers (T. Fowler)
|
#5 2006 Dec 07 |
- Round table
+ Status of drawings for PS and TT2 (G. Villiger) + Shutdown work (R. Brown) + Status of TT2 activities (C. Lacroix) + Status of drawings for octupoles and vacuum chambers for MU14,
15, 16 (G. Villiger) + Planning for Tekelec power converters (A. Beuret)
|
#4 2006 Nov 23 |
- Round table
+ Status of kickers [orders] (T. Fowler)
+ Status of TT2 activities (C. Lacroix)
+ workshop activities (M. Giovannozzi)
+ Shutdown work (R. Brown)
+ The 80 MHz RF cavity activities (C. Rossi)
|
#3
2006 Nov 9 |
- Status of kickers for MTE (T. Fowler) Slides [pdf]
- Round table
+ Progress in vacuum chambers for 2006/7 installation (G.
Villiger)
+ Activities related with the displacement of the DFA243 (M.
Giovannozzi)
|
#2 2006 Nov 2 |
- Draft schedule for MTE Project (M. Giovannozzi) Slides [pdf]
- Round table:
+ Status of new
octupoles (T. Zickler and G. Villiger)
+ Status of vacuum
chambers for 2006/7 installation (G. Villiger)
+ Progress in the
design of vacuum chambers for 2007/8 installation (G.
Villiger)
|
|
Current status of the MTE project. Slides [pdf]
|