Multi-Turn Extraction

  index || why mte | who are we | documents | links | minutes | actions | contacts |

 Minutes                                                                                                                MTE actions

Date & n.
Agenda meeting: Thursday January 15th at 16:00, in room 6-2-004 [unusual place]
      #87 2014 March 20
  1. BTV Installation status (S. Burger)
  2. PS PE.TPS15 displacement system (P. Van Trappen)
      #86 2014 January 9
  1. Dummy septum impedance measurements (S. Persichelli)
      #85 2013 November 28
  1. Projet BTV Dummy 15 (N. Jurado)
      #84 2013 November 21
  1. Dummy septum impedance measurements (S. Persichelli)
      #83 2013 October 10
  1. TPS Progress (M. Hourican)
      #82 2013 September 19
  1. TPS Progress (M. Hourican)
      #81 2013 August 29
  1. Review of progress with activities
      #80 2013 August 7
  1. Draft report on dummy septum 15
      #79 2013 July 4
  1. Individual and Collective Dose Estimates for Interventions at the PS SS15 (S. Damjanovic)
      #78 2013 June 13
  1. Dummy 15 BTV Screen considerations (S. Burger)
      #77 2013 May 30
  1. Local Shielding around the Dummy Septum 15 (S. Damjanovic)
      #76 2013 May 23
  1. Shielding in septum 15 blocks configuration (R. Fernandez Ortega)
  2. Status and developments of the shielding studies for the dummy septum TPS15 (M. Hourican)
      #75 2013 May 16
  1. Shielding in septum 15 blocks configuration (R. Fernandez Ortega)
  2. Status and development of the BTV for the dummy septum TPS15 (S. Burger)
      #74 2013 May 2
  1. Dummy septum impedance studies (S. Persichelli)
  2. Status and developments of the shielding studies for the dummy septum TPS15 (M. Hourican)
      #73 2013 April 11
  1. Shielding in septum 15 blocks configuration (R. Fernandez Ortega)
  2. Shielding around the Dummy Septum15: Original vs. Final design (S. Damjanovic)
      #72 2013 April 4
  1. Review of PS dummy septum shielding (R. Fernandez Ortega)
  2. Comments on the proposed shielding (J.-M. Lacroix)
      #71 2013 February 28
  1. Review of PS dummy septum shielding (R. Fernandez Ortega)
      #70 2013 February 8
  1. Shielding blocks requirements (M. Hourican)
      #69 2013 January 17
  1. Status and developments of the shielding studies for the dummy septum TPS15 (M. Hourican)
  2. Comments on dummy 15 BTV instrument (S. Burger)
      #68 2012 December 13
  1. Status and developments of the shielding studies for the dummy septum TPS15 (M. Hourican)
      #67 2012 November 22
  1. Individual and Collective Dose Estimates for Interventions at the PS SS15 (S. Damjanovic)
  2. MTV DUMMY 15 Development Status (S. Burger on behalf of D. Gerard)
  3. Status and developments of the shielding studies for the dummy septum TPS15 (M. Hourican)
      #66 2012 November 1
  1. Intervention Scenarios TPS15 (M. Hourican)
  2. Dose Estimate for the Extra Vacuum Pump in SS15 under Irradiation (S. Damjanovic)
      #65 2012 October 19
  1. Dummy septum impedance studies (S. Persichelli)
      #64 2012 October 11
  1. Status and developments of the dummy septum TPS15 for the CERN PS Multi-Turn Extraction - beam observation discussions (M. Hourican)
  2. Dummy 15: extra pump study (C. Pasquino)
  3. Shadowing of SMH16 Realistic beam tracking with FLUKA/PTC (S. Damjanovic, C. Hernalsteens)
      #63 2012 September 27
  1. Status and developments of the dummy septum TPS15 for the CERN PS Multi-Turn Extraction(M. Hourican)
  2. Where to put an extra pumping port (C. Pasquino)
      #62 2012 September 13
  1. Vacuum Analysis of PS Sector 20 (C. Pasquino)
  2. Dummy septum: update on the shadowing studies (C. Hernalsteens)
      #61 2012 August 30
  1. Dummy septum: beam dynamics and shadowing studies (C. Hernalsteens)
      #60 2012 August 2
  1. Shadowing of SMH16 by the dummy septum (C. Hernalsteens)
      #59 2012 July 5
  1. Status and developments of the dummy septum TPS15 for the CERN PS Multi-Turn Extraction (H. Hourican)
      #58 2012 June 7
  1. Shadowing of SMH16 by the dummy septum (C. Hernalsteens)
  2. Angular stability at extraction in the PS (A. Lachaize)
  3. Status and developments of the dummy septum TPS15 for the CERN PS Multi-Turn Extraction (H. Hourican)
      #57 2012 May 10
  1. Dose and Radiation Damage in the PS Magnet Coils (S. Damjanovic)
      #56 2012 April 26
  1. PS wall layout and preliminary integration of dummy septum (J.-M. Lacroix)
  2. Sensitivity of the BLM position in SS15 to the dummy blade angle (S. Damjanovic)
  3. Shielding Effects of Supplementary Walls Region of LINAC3 (S. Damjanovic)
      #55 2012 March 29
  1.  Proposal of a dummy septum to mitigate ring irradiation for the CERN PS Multi-Turn Extraction: part III (M. Hourican)
  2.  Aperture and geometry for the dummy septum in SS15 (C. Hernalsteens)
      #54 2012 March 15
  1. Energy Deposition in Dummy Septum Blade Beam Screen Window Dummy Septum Tank Vacuum Chamber of MMU15 (S. Damjanovic)
  2. Optimization of the local shielding around the dummy septum 15 (S. Damjanovic)
      #53 2012 March 1
  1. Proposal of a dummy septum to mitigate ring irradiation for the CERN PS Multi-Turn Extraction: part II (M. Hourican)
  2. Energy deposition in dummy septum blade, dummy septum tank, vacuum chamber MMU15  (S. Damjanovic)
      #52 2012 February 3
  1. Dummy septum in SS15 of PS ring in LS1 (M. giovannozzi)
  2. Dummy Septum in SS15 (S. Damjanovic)
  3. Proposal of a dummy septum to mitigate ring irradiation for the CERN PS Multi-Turn Extraction (M. Hourican)
      #51 2011 October 20
  1. Analysis of recent PS measurements
      #50 2011 September 1
  1. Analysis of recent PS measurements
      #49 2011 August 25
  1. Analysis of recent PS measurements
      #48 2011 July 28
  1. Analysis of recent PS measurements
  2. Displacement of γ-jump quadrupole in SS15
      #47 2011 July 7
  1. Analysis of recent PS measurements
      #46 2011 May  19
  1. Analysis of recent PS measurements
      #45 2011 May  12
  1. Analysis of recent PS measurements
      #44 2011 May  5
  1. Analysis of recent PS measurements
      #43 2011 Apr  14
  1. Trajectory fluctuations in SPS: latest results
      #42 2011 Mar  10
  1. Global analysis of MTE and CT beams in PS and SPS
      #41 2011 Feb  16
  1. MTE action plan - what is foreseen in 2011?
      #40 2009 Mar  3
  1. Summary of the meeting on the RF for MTE  (March 3rd 2009)
      #39 2009 Jan 27
  1. Summary of the meeting on MTE controls (January 27th 2009)
#38  2009 Jan 15
  1. Status of production of spare MU16 vacuum chamber (M. Giovannozzi)
  2. Summary of beam commissioning results (M. Giovannozzi)
  3. Proposal for EDMS node for MTE (M. Giovannozzi)
  4. Kicker activities during 2008/9 shut down in light of beam commissioning results (L. Sermeus)
#37  2008  Sep 25
  1. Round table on
    + MTE beam commissioning status (S. Gilardoni)
    + Status of production of spare MU16 vacuum chamber (M. Caccioppoli)
    + Overall planning of PS 2008/9 shutdown (R. Brown)
    + Status of drawings for MTE-related modifications (J.-M. Lacroix)
    + Status of hardware for installation of new flying wire (C. Ball)
    + Kickers’ activities for MTE during 2008/9 shutdown (L. Sermeus)
#36  2008  July 16
  1. Round table on
    + status of kickers (T. Fowler)
    + status of MTE commissioning (M. Giovannozzi)
#35  2008  July  3
  1. Round table on
    + status of kickers (T. Fowler)
    + status of MTE commissioning (M. Giovannozzi)
#34  2008  June 19
  1. Round table on
    + status of kickers (T. Fowler)
    + status of MTE commissioning (M. Giovannozzi)
#33  2008  June 5
  1. Round table on
    + status of kickers (T. Fowler)
    + status of MTE commissioning (S. Gilardoni)
#32  2008  May 27
  1. Round table on
    + status of kickers (L. Sermeus / T. Fowler)
    + status of controls (C. Dehavay)
    + situation of MTE magnets (M. Giovannozzi)
  2. MTE commissioning planning (M. Giovannozzi) [PDF]
#31  2008  May  8
  1. Round table on
         + status of controls (C. Dehavay)
         + situation of MTE magnets (M. Giovannozzi)
#30  2008  Apr 24
  1. Round table on
         + status of kickers' PFNs (L. Sermeus)
         + status of controls (C. Dehavay)
         + situation of spare gamma-jump quadrupole (M. Giovannozzi)
#29  2008  Apr 10
  1. Round table on
         + general status of PS (R. Brown)
         + octupole magnets (D. Bodart)
         + discharge power converters (J.-M. Cravero)
         + kickers (L. Sermeus)
         + status of PFNs (L. Sermeus)
         + status of controls (C. Dehavay)
         + situation of spare gamma-jump quadrupole (M. Karppinen / M. Giovannozzi)
#28  2008  Mar 13
  1. Round table
        + Status of shut-down activities (R. Brown)
        + Status of kickers (T. Fowler/M. Giovannozzi)
        + Status of controls (C. Dehavay)
        + Status of new magnets (D. Bodart/M. Giovannozzi)
#27  2008  Feb 28
  1. Round table
        + Status of kickers (L. Sermeus)
        + Status of programmable power converters (A. Beuret)
        + Status of shut-down activities (R. Brown) 
        + Status of new magnets (M. Giovannozzi)
#26  2008  Feb 19
  1. Round table
        + Status of kickers (T. Fowler)
        + Status of discharge power converters (J-M Cravero)
        + Status of new magnets (D. Bodart & M. Giovannozzi)
        + Status of controls for MTE (C. Dehavay)
        + Status of shut-down activities (M. Giovannozzi) 
#25  2008  Jan 31
  1. Round table
        + Status of the new vacuum chambers (M. Caccioppoli & R. Principe)
        + Status of shut-down activities (R. Brown) 
        + Status of octupoles (D. Bodart)
        + Status of kickers (T. Fowler)
        + Displacement of a PS corrector magnet (M. Giovannozzi)
#24  2008  Jan 16 1. Round table
    + Status of controls for MTE (C. Dehavay)
    + Status of the new vacuum chambers (M. Caccioppoli/G. Favre)
    + Status of kickers (T. Fowler)
    + Status of shut-down activities & bump 16 cables (R. Brown)
    + Status of octupoles (D. Bodart)
    + Status of spare gamma-jump quadrupole (D. Bodart)
    + Status of (discharge & programmable) power converters (J-M Cravero & A. Beuret)

#23  2007  Dec 19

  1. Round table:
    + Situation of special vacuum chambers (M. Caccioppoli/G. Favre)
    + Status of kickers (T. Fowler)
    + Status of shut-down activities & bump 16 cables (R. Brown)
    + situation of octupoles (D. Bodart)

#22  2007  Dec 04

  1. Round table:
    + Situation of special vacuum chambers (M. Caccioppoli/G. Favre)
    + Status of kickers (T. Fowler)
    + Status of the bump 16 cables (R. Brown)
    + situation of octupoles (D. Bodart) [JPG]

#21  2007  Nov 22

  1. Situation of special vacuum chambers (M. Caccioppoli)
  2. Back-up solution for bump 16 power converters in case of late delivery of cables (J.-M. Cravero) [DOC]
  3. Round table:
    + situation of octupoles (D. Bodart/T. Zickler) [JPG]
    + situation of kickers (T. Fowler)
    + overall situation of shutdown activities (R. Principe) [PPT, MPP]
    + naming of PS elements and controls (A. Franchi) [PDF]

#20  2007  Nov 5

  1. Status of kickers (L. Sermeus) [PPTX]
  2. Status of special vacuum chambers (M. Giovannozzi)
  3. Status of controls (C. Dehavay) [PDF1,PDF2]
  4. Status of cables (R. Brown/M. Giovannozzi)

#19  2007  Oct 26

  1. Status of power converters (A. Beuret & J.-M. Cravero)
  2. Status of cables (R. Brown)
  3. Status of magnets (D. Bodart) [PDF]
  4. Status of special vacuum chambers (M. Caccioppoli)
  5. Workshop activities (SS vacuum chambers and supports) (G. Villiger) [PPT]
  6. Changes to the PS shut down schedule (R. Brown/R. Principe)

#18  2007  Oct  4

  1. Comments on vacuum acceptance tests at Zanon (E. Mahner) 
  2. Update on vacuum chambers MU14/15/16 (M. Giovannozzi)
  3. Final layout of cables (R. Brown/M. Giovannozzi)
  4. Status of octupoles (T. Zickler)
  5. Functional specification for kickers and safety issue (T. Fowler)
  6. Status report on the production of the new spare gamma-jump
    quadrupole (M. Karppinen) [PPT]

#17  2007  Sep  13

  1. Change of schedule for installation of third horizontal wire scanner (R. Principe/M. Giovannozzi) [PDF]
  2. Update on vacuum chambers from Zanon (M. Giovannozzi)
  3. OCT and XCT RMS currents for cabling (A. Franchi) [PDF]
  4. Definition of signals for the MTE (R. Steerenberg) [PDF]

#16  2007  Aug  30

  1. Situation of the cards for passive circuit compensation in MU14, 15, 16 (M. Giovannozzi)
  2. Status of vacuum chambers and bellows for new vacuum chambers for MU14,15,16 (M. Caccioppoli)
  3. MTE Planning (J. Monteiro) [PDF]
  4. Status of Sextupole and octupole cabling (R. Brown)

#15  2007  Aug  02

  1. Status of vacuum chambers at Zanon, bellows and flanges (M. Caccioppoli)

#14  2007  Jul  05

  1. Presentation of the new accelerator schedule (M. Giovannozzi) [PDF]
  2. Discussion of signals for the MTE (R. Steerenberg) [XLS]
  3. Round table
    - status of Octupoles (T.Zickler/D. Bodart) [PDF]
    - Situation of vacuum chambers at Zanon (M. Giovannozzi)

#13  2007  Jun  07

  1. Report on the search for vacuum chamber during the technical stop (G. Villiger) [PDF]
  2. New constraints in SS15 

#12  2007  May  24

  1. Status of MU14, 15, 16, vacuum chambers at Zanon (M. Caccioppoli)
  2. Status of integration of kickers in SS04, 13, 21 (G. Villiger) Slides [PTT]
  3. Vacuum acceptance tests schedule (E. Mahner)

#11  2007  May  10

  1. MD studies in 2007 (S. Gilardoni)
  2. Integration of kickers (G. Villiger) Slides [PTT] table [XLS]
  3. Round table
    + Availability of vacuum chambers and flanges from vacuum stocks (E. Mahner)
    + Status of the controls for the MTE (F. Di Maio)

#10  2007  April 26

  1. New scheme for the correction of trajectories in TT2 (A. Franchi) [PTT]
  2. Round table
    + Status of the new special vacuum chambers (M. Giovannozzi)
    + Status of the new octupoles (T. Zickler) 
    + Activities for next shutdown (G. Villiger)

#9    2007  Mar 29

  1. Round table
    + Status of the new vacuum chambers (M. Giovannozzi)
    + Status of the new octupoles (T. Zickler) 
    + Status of PS hardware commissioning (R. Brown)
    + Report on the 80 MHz RF cavity test (C. Rossi)  Slides [PDF]
    + Status of the kickers installation in TT2 (L. Sermeus)

#8    2007  Mar 01

  1. Budget status for kickers (T. Fowler)  Table [PDF]
  2. Planning of the MTE activities in 2007/8 (J. Monteiro) Table1 [PDF] Table2 [PDF]
  3. Round table
    + Status of new octupoles (T. Zickler)
    + Status report of PS ring installation (R. Brown)

#7    2007  Feb 01

  1. Status of new vacuum chambers for MU14, 15, 16 (R. Principe)
  2. Round table
    + Status report of PS ring installation (R. Brown)
    + Status of RF cavity move (C. Rossi)
    + Status report of TT2 installation (J. Monteiro)

#6    2007  Jan 18

  1. Status of design of vacuum chambers for MU14, 15, 16 (G. Villiger) Slides [pdf]
  2. Round table
    + Status of new octupoles (T. Zickler)
    + Status report of PS ring installation (R. Brown)
    + Status report of TT2 installation (J. Monteiro)
    + Status of kickers (T. Fowler)

#5    2006 Dec 07

  1. Round table
    + Status of drawings for PS and TT2 (G. Villiger)
    + Shutdown work (R. Brown)
    + Status of TT2 activities (C. Lacroix)
    + Status of drawings for octupoles and vacuum chambers for MU14, 15, 16 (G. Villiger)
    + Planning for Tekelec power converters (A. Beuret)

#4    2006 Nov 23

  1. Round table
    + Status of kickers [orders] (T. Fowler)
    + Status of TT2 activities (C. Lacroix)
    + workshop activities (M. Giovannozzi)
    + Shutdown work (R. Brown)
    + The 80 MHz RF cavity activities (C. Rossi)

#3     2006 Nov  9

  1. Status of kickers for MTE (T. Fowler) Slides [pdf]
  2. Round table
      + Progress in vacuum chambers for 2006/7 installation (G. Villiger)
      + Activities related with the displacement of the DFA243 (M. Giovannozzi)

#2    2006 Nov  2

  1. Draft schedule for MTE Project (M. Giovannozzi) Slides [pdf]
  2. Round table:
      + Status of new octupoles (T. Zickler and G. Villiger)
      + Status of vacuum chambers for 2006/7 installation (G. Villiger)
      + Progress in the design of vacuum chambers for 2007/8 installation (G. Villiger)

Current status of the MTE project.  Slides [pdf]

 

   
 top  |  index