Main items
Conclusions and actions from
the meeting |
-
Data concerning blocks available at CERN, size, and
costs were circulated for the optimisation studies of the shielding
(thanks to Michael Lazzaroni).
-
Stops position for the block
supporting the dummy septum should be envisage to ease
re-alignment in case of changes in SS15 (e.g., due to
intervention on MMU14).
-
A safety factor on the losses should be taken
into account (from 1% - value currently used - to 2%).
-
The
longitudinal position of the dummy septum should be optimised for
shielding in the downstream side (Action: RP).
-
The shielding height should be optimised (2.40m is still acceptable for transport)
(Action: RP).
-
The
characteristics of the dummy septum should be reviewed in the energy
deposition studies (tank length and thickness, cross section of beam
screen and MMU 15 vacuum chamber) (Action: RP, ATB, ABP).
-
Energy deposition data will be used
to estimate (assuming a steady state situation) temperature increase in
various parts (Action: ABT).
-
Based on density considerations, it will be determined
whether Glidcop might be a suitable material for the dummy septum blade
(Action: RP, ATB).
-
Only in case the temperature increase will be worrying, then Glidcop
might be considered for a new set of simulations of activation and
energy deposition (Action: RP, ATB).
-
After having optimised the shielding the situation
of activation of MMU15 will be reviewed (Action: RP).
-
Tracking of particles should
be considered (Action: RP and ABP).
|
|
|