Minutes of the
69th MTE meeting held on Thursday January 17th 2013
Present :
J. Bento,
R. Brown,
S. Damjanovic, P. Demarest, S. Gibson, M. Giovannozzi, C.
Hernalsteens, M. Hourican, S. Mataguez.
Excused :
J. Borburgh, S. Gilardoni.
Main items
Conclusions and actions from
the meeting
The design of the shielding has been analysed:
The new design seems unnecessarily complex.
We should revert to the previous design (Action: Mike to
prepare the final layout).
The space around the flanges seems to the be
enough for the installation of the RF by-pass and tight, but
still acceptable for the installation. It is proposed to have a
look at the installation of the PS internal dumps to verify the
available space for a device with a similar design as the dummy
septum shielding.
A single block should be installed to cover
the shielding. Due to the non-standard size of the required
block, either a standard block should be cut to the correct
size, or a special block should be made (Action: Massimo to contact M. Lazzaroni).
Once the final layout is ready approval by
all experts will be requested(Action:
Massimo to contact experts).
The final layout of the dummy septum will be
sent to the impedance team for final evaluation of the impedance (Action:
Mike to
send the drawings to Benoit and Serena).
The MTV proposal is progressing and construction
drawings have been launched.
No slit in the dummy septum blade will be
made.
A document has been provided by S. Burger
concerning the time required for interventions on the BTV
installed in the septum in view of evaluating the dose delivered
to personnel.