Minutes of the
71st MTE meeting held on Thursday February 28th 2013
|
Present :
S. Damjanovic, R. Fernandez Ortega, M. Giovannozzi, M. Hourican,
J.-M. Lacroix.
|
Excused :
J. Borburgh, P. Demarest, C. Hernalsteens.
|
Main items
Conclusions and actions from
the meeting |
-
The design of the shielding has been reviwed:
-
A special block will be built with holes for
the manual system to move the blade in case of major failure.
-
The changes on the base of the shielding
(according to the requests of transport experts and magnet
experts) are not relevant for radio protection and are approved.
-
All the blocks are concrete blocks apart from
three that are marble blocks. The presence of lifting points for
the marble blocks should be checked (Action: Raul).
-
Next steps:
-
The final layout in 3D will be circulated
by end of next week (Action: Raul).
-
All people concerned should provide
feedback and comments (Action: All).
-
In parallel the analysis of avaialbility
of blocks will be carried out (Action: Raul).
-
The 3D model of the dummy septum will be
integrated in the shielding layout to ensure full
compatibility (Action: Raul, Mike).
-
Other activities:
-
A formal EDMS approval round of the septum
laytou will be launched (Action: Mike).
-
A schedule of the various activities,
including also installation, will be prepared (Action:
Mike). This will enable RP to analysis the IMPACT
activity.
-
A formal EDMS approval round is also foreseen
for the shielding layout (Action: Raul).
|
|
|