Minutes of the
74th MTE meeting held on Thursday May 2nd 2013
|
Present :
M. Giovannozzi, M. Hourican, J.-M. Lacroix, S. Mataguez, M. Migliorati,
S. Persichelli, B. Salvant.
|
Excused :
P. Demarest, R. Fernandez Ortega, S. Gilardoni, C. Hernalsteens.
|
Main items
Conclusions and actions from
the meeting |
-
The impedance contribution of the new dummy septum
design has been studied in details. Main points and conclusions:
-
A line at about 112 MHz has been found, which
is generated by the gap between the beam screen and the support
table. This line was not found in the previous model because of
an issue with the mesh generation. The best fix to this is the
installation of sliding contacts. It has been decided to install
sliding contacts of three sides of the supporting table.
-
The ferrites are no more needed. In any case,
the estimated beam power deposited should be rather small (the
value of 1.8 W represents only the contribution from
the peak of the impedance. In case of need a proper integration
should be performed).
-
The rise time of the instability in the most
dangerous configuration, i.e., short bunches and close to the
blade of the dummy septum is more than 150 ms (to be compared
with the 6 ms to raise the slow bump prior to extraction).
-
Bench measurements are foreseen in September.
The detailed schedule will be prepared by Mike.
-
Next steps:
-
Check whether additional sliding contacts
on each side of the blade in the upper part can further
improve the situation (Action: Serena).
-
Check the required pressure of the
sliding contacts (Action:
Benoit).
-
Progress of dummy septum:
-
The integration has been verified and
corrected. The nominal beam position has been used to locate
the dummy septum position in the transverse plane.
-
The integration of the proposed shielding
with the dummy septum is fine, as well as with the PS ring and
the area close to SS15.
-
A proposal of schedule is presented: it
should be verified by other experts.
-
Next steps:
-
The dimensions of the aperture for the
passage of the downstream beam pipe should be reviewed and
communicated to Raul (Action: Mike).
-
Some inconsistencies in the vertical
dimension of the shielding have been found and will be
communicated to Raul (Action: Massimo).
-
Feedback concerning the schedule
presented by Mike from other experts should be gathered
(Action: Massimo).
|
|
|