Minutes of the
75th MTE meeting held on Thursday May 16th 2013
|
Present :
S. Burger, S. Damjanovic, P. Demarest, R. Fernandez Ortega, S.
Gilardoni, M. Giovannozzi, M. Hourican, S. Mataguez.
|
Excused :
C. Hernalsteens.
|
Main items
Conclusions and actions from
the meeting |
-
Almost final layout of the shielding for the
dummy septum:
-
The inter-axis distance for the two holes
should be 300 mm. The corresponding block should be built and
then the two holes drilled to provide fillers to be used when
the cranks are not inserted.
-
The longitudinal dimension of the top block
should 950 mm to avoid any interference with the ion pump.
-
The block supporting the dummy septum should
be part of the shielding model.
-
The dimension of the hole for the main bus
bars should be confirmed by D. Bodart as being compatible also
with the new bus bars (Action: Massimo to contact
Dominique).
-
Next steps:
-
Revised layout to be circulated to check
for integration, with dummy septum and with PS ring (Action:
Raul)
-
An EDMS approval should be set-up to
collect the comments quickly (Action: Mike and
Massimo).
-
Concerning the shielding to be installed
in SS75, it seems the current layout is suitable, provided
that the thick side wall is used both on the inside and
outside of the ring. Confirmation of this will be given to
Raul (Action: Simone).
-
Progress of BTV:
-
One month delay in the preparation of the
prototype mechanics, but this could be easily compensated for.
-
Critical components are already available.
-
The installation of the filter wheel should
be done such to simplify its access.
-
There is synergy with the development of the
foil mechanism for the PSB. Estimated costs should be respected.
-
Next steps:
-
Next steps:
-
Prepare a global planning for the dummy
septum activities (Action: Mike).
-
Review radiation simulations and
intervention times to allow establishing official figures
concerning radiation doses (Action: Sanja).
-
Prepare for writing a detailed report of
the dummy septum activities. The structure will be prepared
and distributed
(Action: Massimo).
|
|
|