Minutes of the
76th MTE meeting held on Thursday May 23rd 2013
|
Present :
R. Fernandez Ortega, J. A. Ferreira Somoza, S.
Gilardoni, M. Giovannozzi, M. Hourican, S. Mataguez.
|
Excused :
S. Damjanovic, P. Demarest, C. Hernalsteens.
|
Main items
Conclusions and actions from
the meeting |
-
Final layout of the shielding for the
dummy septum:
-
The longitudinal dimension of the top block
should is 900 mm to avoid any interference with the ion pump.
-
D. Bodart confirmed that the new bus bars
have the same overall size as the current ones.
-
Integration (with PS ring and dummy septum)
has been checked: a longitudinal displacement of the downstream
wall should be applied at construction time.
-
Next steps:
-
An EDMS approval should be set-up to
collect the comments quickly, i.e., a week of time (Action:
Mike).
-
Information concerning the manufacturing
delay and costs should be provided (Action: Raul and
Eliseo).
-
After the completion of the FLUKA
simulations a decision will be taken as of the layout of the
shielding to be installed
in SS75 (Action: Simone).
-
Overall planning:
-
Next steps:
-
Review radiation simulations and
intervention times to allow establishing official figures
concerning radiation doses (Action: Sanja).
-
Prepare for writing a detailed report of
the dummy septum activities. The structure will be prepared
and distributed
(Action: Massimo).
|
|
|