Minutes of the
84th MTE meeting held on Thursday November 21st 2013
|
Present :
H. Damerau,
M. Giovannozzi, N. J. Jurado, M. Hourican, S. Persichelli, B. Salvant,
S. Vollaire.
|
Excused :
S. Gilardoni, C. Hernalsteens.
|
Main items
Conclusions and actions from
the meeting |
-
Impedance measurements
-
There is a good agreement for the first mode
between simulations and measurements.
-
This is not the case for the second mode.
Although it is beyond the extension of the bunch spectrum, it
would be nice to understand the situation.
-
The statement at the time of the simulation
campaign is still valid: there are no obstacles to the
installation of the dummy septum. Nevertheless, an official
statement will be prepared (Action: Benoit).
-
Simulations of the SMH16 have been carried
out, already, but it is not felt that they can be used to
provide an additional benchmark of the dummy septum simulations
and measurements.
-
It is proposed to perform another simulation
in which the blade is set to the parking position (Action:
Serena).
-
It is proposed to prepare a short summary of
the measurement results to be added to the report that is being
prepared (Action: Serena).
-
Dummy septum status:
-
The assembly activities are finished.
-
The orientation of the axis of the motors is
now vertical, which prevents using a crank to move the blade to
the parking position in case of serious failure. An solution
should be found in order to keep the intervention short in order
to minimise the impact on the beam availability to the LHC
(Action: Mike).
-
Shielding:
-
BTV:
-
Overall schedule:
|
|
|