Main items
Conclusions and actions from
the meeting |
-
A third round of impedance measurements have been
performed this week following the failure of the sliding contact and
the dismounting and rebuilding of the dummy septum. Short history of
impedance measurements:
-
First measurement: November 2013. The first
peak was found in agreement with numerical simulations. The
second peak was not in good agreement. Nonetheless, it should
not be relevant for beam dynamics as it is beyond the bunch
spectrum.
-
Second measurement: December 2013. The first
peak was found at higher frequency than in previous measurement.
No attenuators were used. The position of the blade was not
recorded. Following the measurement, some sliding contacts were
found broken, but it was not clear the actual situation during
the measurements. The BTV was not installed.
-
Third measurement: January 2014. The first
peak is again in agreement with numerical simulations, while the
second one was not and was at a different frequency than in the
first measurement. Some differences in the measurement set-up
were introduced, but this should not explain the shift in
frequency of the second peak.
-
All in all, the current situation is
considered to be very much the same as for the first measurement
and the impedance measurement does not show any feature that
prevents the installation of the TPS15.
-
All people involved in the impedance
measurements and dummy septum dismantling and reassembly are
warmly acknowledge for the swift actions!
-
TPS15 status and tests:
-
Following the failure of the installed
sliding contacts the dummy septum has be dismounted and
reassembled. The issue has been traced back to a dimensional
problem, which reduced the gap (1 mm, only) between the two
parts to be put in contact. This has been fixed and current
value of the distance is 3 mm. Mike is fully confident about the
functionality of the sliding contacts in the present
configuration.
-
The dummy septum is being pumped down
following the completion of the impedance measurements.
-
All control tests have been performed with
local control and the device passed all of them.
-
BTV status and tests:
-
Overall schedule:
-
The installation date of MU14 is 13/1 and a
couple of days are expected to be needed to perform the
necessary actions before TPS15 can be installed. In particular,
the positioning of the support blocks on the floor will require
using the alignment target on MU14 and 15.
-
The current date for the installation
activities of TPS15 is not earlier than 15/1.
-
Miscellaneous
|
|
|